Report from construction site "GROZNY MALL" Shopping and Entertainment Center

06.07.2017

Report from the building site MFC “Akhmat Tower”

05.07.2017

Report from the building site MFC “Akhmat Tower”: The works on felling cap sills are completed

24.01.2017

Construction permit for "GROZNY MALL" is obtained!

13.01.2017

Positive survey report from Expertiza is obtained for "GROZNY MALL"

17.12.2016

Opening of the presentation pavilion MFC “Akhmat Tower” and Shopping Mall “Grozny Mall”

17.11.2016

Report from the building site Shopping Mall “Grozny Mall”: Overhanging utilities systems and communications from the built-up area of the site

16.11.2016

Report from the building site MFC “Akhmat Tower”: The works on felling cap sills are completed on 30%

15.11.2016

The presentation pavilion is ready for meeting guests

02.11.2016

Time capsule laying ceremony for "GROZNY MALL"

27.05.2016

Subsurface exploration at “Schematic Design” stage.

30.12.2014

Design companies are selected for “Akhmat Tower” project

22.12.2014

«EAGLE HILLS» is involved as an official consultant at “Akhmat Tower” project.

08.12.2014

Subsurface Exploration Survey at concept stage is carried out

08.09.2014

Certificates of title for construction of Retail Centre “GROZNY MALL” are obtained

28.08.2014

Seismicity of construction site

27.05.2014

Certificates of title for construction of MFC “Akhmat Tower” are obtained

06.05.2014

Last events

Report from construction site "GROZNY MALL" Shopping and Entertainment Center

06.07.2017

Report from the building site MFC “Akhmat Tower”

05.07.2017

Report from the building site MFC “Akhmat Tower”: The works on felling cap sills are completed

24.01.2017

Contact